Next to the St.Jozephchurch/ROZET, the second part of the Masterplan is finalized. By the end of 2019 the two apartmentblocks will be finished. For the whole plan, look at the projectpage.
Next to the St.Jozephchurch/ROZET, the second part of the Masterplan is finalized. By the end of 2019 the two apartmentblocks will be finished. For the whole plan, look at the projectpage.